ASTM International, 11/01/2009
Publisher: ASTM
File Format: PDF
$32.00$65.00
Published:01/11/2009
Pages:14
File Size:1 file , 690 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP.
1.2 JPM measures labor productivity of the installation processes on a construction job.
1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering.
1.4 JPM takes into account the difficulty of installation at any given point on a job.
1.5 JPM evaluates relative productivity changes using trend monitoring.
FIG. 1 Measurement of Productivity at the Industry, Project, and Task Level
Standard Test Method for Oxidation Stability of Inhibited Mineral Insulating Oil by Pressure Vessel
$25.00 $50.00
Standard Specification for Stainless Steel Bars and Shapes for Use in Boilers and Other Pressure Vessels
$30.00 $60.00
Standard Test Method for Research Octane Number of Spark-Ignition Engine Fuel
$47.00 $94.00
Standard Guide for Application of Fully Adhered Hot-Applied Reinforced Waterproofing Systems
$26.00 $52.00