Your shopping cart is empty!
ASTM International, 11/01/2011
Publisher: ASTM
File Format: PDF
$41.00$83.00
Published:01/11/2011
Pages:20
File Size:1 file , 1000 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP.
1.2 JPM measures labor productivity of the installation processes on a construction job.
1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering.
1.4 JPM takes into account the difficulty of installation at any given point on a job.
1.5 JPM evaluates relative productivity changes using trend monitoring.
FIG. 1 Measurement of Productivity at the Industry, Project, and Task Level
Standard Performance Specification for Protective Clothing Worn by Operators Applying Pesticides
$29.00 $58.00
Standard Test Method for Carbon Black -- Morphological Characterization of Carbon Black Using Electron Microscopy
$30.00 $60.00
Standard Guide for Care and Handling of Stainless Steel Surgical Instruments
$24.00 $48.00
Standard Guide for Installation of Flexible Closed Cell Preformed Insulation in Tube and Sheet Form