Your shopping cart is empty!
ASTM International, 03/01/2016
Publisher: ASTM
File Format: PDF
$43.00$86.00
Published:01/03/2016
Pages:25
File Size:1 file , 1.1 MB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP.
1.2 JPM measures labor productivity of the installation processes on a construction job.2
1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering.
1.4 JPM takes into account the difficulty of installation at any given point on a job.
1.5 JPM evaluates relative productivity changes using trend monitoring.
Standard Test Method for Fusibility of Coal and Coke Ash
$26.00 $52.00
Standard Test Method for Column Percolation Extraction of Mine Rock by the Meteoric Water Mobility Procedure
$27.00 $54.00
Standard Guide for Depth Profiling in Auger Electron Spectroscopy
$24.00 $48.00
Standard Test Method for Slow Rate Penetration Resistance of Flexible Barrier Films and Laminates
$31.00 $62.00