AWS D1.9/D1.9M:2015

Structural Welding Code - Titanium

American Welding Society, 08/27/2015

Publisher: AWS

File Format: PDF

$75.00$150.00


Published:27/08/2015

Pages:172

Note:This product is unavailable in Ukraine, Russia, Belarus

This code covers the requirements for design and welding of any type of titanium structure. Titanium pressure vessels and fluid-carrying pipe lines are specifically excluded. Clauses 1 through 5 and Annex A constitute a body of rules for the regulation of welding in titanium construction. A commentary on the code is also included with the document.

More AWS standard pdf

AWS B2.1-1-004:2002 (R2013)

AWS B2.1-1-004:2002 (R2013)

Standard Welding Procedure Specification (Swps) for Gas Metal Arc Welding (Short Circuiting Transfer Mode) of Carbon Steel (M-1, Group 1), 18 through 10 Gauge, in the As-Welded Condition, with or without Backing

$149.00 $299.00

AWS B2.1-8-005:2002 (R2013)

AWS B2.1-8-005:2002 (R2013)

Standard Welding Procedure Specification (Swps) for Gas Metal Arc Welding (Short Circuiting Transfer Mode) of Austenitic Stainless Steel (M-8, P-8, or S-8), 18 through 10 Gauge, in the As-Welded Condition, with or without Backing

$149.00 $299.00

AWS B2.1-1-007:2002 (R2013)

AWS B2.1-1-007:2002 (R2013)

Standard Welding Procedure Specification (Swps) for Gas Tungsten Arc Welding of Galvanized Steel (M-1), 18 through 10 Gauge, in the As-Welded Condition, with or without Backing

$149.00 $299.00

AWS B2.1-8-009:2002 (R2013)

AWS B2.1-8-009:2002 (R2013)

Standard Welding Procedure Specification (Swps) for Gas Tungsten Arc Welding of Austenitic Stainless Steel (M-8, P-8, or S-8), 18 through 10 Gauge, in the As-Welded Condition, with or without Backing

$149.00 $299.00