• BS 6046-2:1992

BS 6046-2:1992

Use of network techniques in project management-Guide to the use of graphical and project estimating techniques

BSI Group, 02/28/1992

Publisher: BS

File Format: PDF

$125.00$251.46


Published:28/02/1992

Pages:28

File Size:1 file

Note:This product is unavailable in Ukraine, Russia, Belarus

Guidance on the two graphical methods of representing the activities in a project: 'activity-on-arrow' and 'activity-on-mode'. A checklist highlights the main factors to consider before choosing the network mode. Recommendations on the level of detail to include, conventions and symbols to use and the estimation of values required for analysing networks.

All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS 02/707777 DC

BS 02/707777 DC

BS 4006-1. Hand operated square drive socket wrenches. Part 1: Unified sizes

$109.00 $218.01

BS 2000-454:2000

BS 2000-454:2000

Methods of test for petroleum and its products-Determination of phosphorus in gasoline. Spectrophotometric method

$71.00 $142.24

BS 02/707774 DC

BS 02/707774 DC

BS 7586-2. Combination wrenches. Part 2: BS/Whitworth sizes

$141.00 $283.46

BS 02/707773 DC

BS 02/707773 DC

BS 7586-1. Combination wrenches. Part 1: Unified sizes

$117.00 $235.79