• CSA ANSI Z21.8-1994 (R2012)

CSA ANSI Z21.8-1994 (R2012)

Installation of Domestic Gas Conversion Burners

CSA Group, 11/02/2000

Publisher: CSA

File Format: PDF

$133.00$266.16


Published:02/11/2000

Pages:70

This is a searchable PDF.

Scope

1.1

Applicability

This standard applies to the installation of a conversion burner with an input of 400,000 Btu per hour (117 228 W) or less and design certified as complying with the Standard for Domestic Gas Conversion Burners, ANSI Z21.17.

This standard, in conjunction with local codes or, in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1, is applicable to situations where an appliance is to be converted to gas with a conversion burner, provided it can be demonstrated under Parts 2 and 3 that such a conversion can be made with safety, economy and in the best interest of the consumer.

All references to ""psi"" throughout this standard are to be considered gage pressure, unless otherwise specified.

Exhibit contains a list of standards specifically referenced in this standard, and sources from which these reference standards may be obtained.

1.2

Safe and Satisfactory Operation

Once the decision has been made to convert an appliance from another fuel to gas, safe and satisfactory operation will be dependent on a number of factors. Among these are: (a) Proper analysis of the feasibility of conversion; (b) Proper selection of the burner to be used; (c) Proper selection of the draft hood or barometric draft regulator to be used; (d) Following the instructions contained in this standard; and (e) Following the installation instructions provided with the conversion burner.

For further information or assistance, the appliance manufacturer should be contacted. In no case should the appliance be modified beyond the recommendation of the appliance manufacturer. If the manufacturer cannot be contacted, the local gas supplier should be consulted.

1.3

Installation

The responsibility for a safe and satisfactory installation is shared by the agency determining the feasibility and selection of the burner, the installer, and the local authority having jurisdiction. In many areas a permit is required. Obtaining this permit is the responsibility of the installer. Maintenance and reporting of possible improper operation is the responsibility of the user. It is the responsibility of the installer to inform the user of the correct operation and maintenance.

More CSA standard pdf

CSA Z259.18:19

CSA Z259.18:19

Counterweighted guardrail systems

$60.00 $120.00

CSA Z45001:19

CSA Z45001:19

Occupational health and safety management systems - Requirements with guidance for use

$104.00 $209.00

CSA C22.2 NO. 60601-2-2:19

CSA C22.2 NO. 60601-2-2:19

Medical electrical equipment - Part 2-2: Particular requirements for the basic safety and essential performance of high frequency surgical equipment and high frequency surgical accessories (Adopted IEC 60601-2-2:2017, sixth edition, 2017-03, with Canadian deviations)

$203.00 $407.00

CSA C22.2 NO. 293.3:19/IEEE 844.3-2019

CSA C22.2 NO. 293.3:19/IEEE 844.3-2019

IEEE/CSA Standard for Impedance Heating of Pipelines and Equipment - General, Testing, Marking, and Documentation Requirements

$55.00 $110.00