• IEC 61158-4-2 Ed. 2.0 en:2010

IEC 61158-4-2 Ed. 2.0 en:2010

Industrial communication networks - Fieldbus specifications - Part 4-2: Data-link layer protocol specification - Type 2 elements

International Electrotechnical Commission, 08/06/2010

Publisher: IEC

File Format: PDF

$179.00$359.00


Published:06/08/2010

Pages:281

File Size:1 file , 1.8 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

IEC 61158-4-2:2010(E) describes the protocol that provides communication opportunities to all participating data-link entities, sequentially and in a cyclic synchronous manner. Foreground scheduled access is available for time-critical activities together with background unscheduled access for less critical activities. Deterministic and synchronized transfers can be provided at cyclic intervals up to 1 ms and device separations of 25 km. This performance is adjustable dynamically and on-line by re-configuring the parameters of the local link whilst normal operation continues. By similar means, DL connections and new devices may be added or removed during normal operation. This protocol provides means to maintain clock synchronization across an extended link with a precision better than 10 s. This second edition cancels and replaces the first edition published in 2007 and constitutes a technical revision. The main changes with respect to the previous edition are:
-Clause 2 and Bibliography: update of normative and bibliographic references;
- subclause 3.5: update of abbreviations;
- subclause 7.6: updates of the Ethernet Link object;
- subclause 7.7: minor update of the Devicenet object (additional attribute);
- new subclauses 7.9 and 7.10: new DLR and QoS objects;
- new Clause 10: new DLR protocol.

More IEC standard pdf

IEC 62779-3 Ed. 1.0 b:2016

IEC 62779-3 Ed. 1.0 b:2016

Semiconductor devices - Semiconductor interface for human body communication - Part 3: Functional type and its operational conditions

$47.00 $95.00

IEC 62424 Ed. 1.0 b:2008

IEC 62424 Ed. 1.0 b:2008

Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools

$193.00 $387.00

IEC 60794-3-60 Ed. 1.0 en:2008

IEC 60794-3-60 Ed. 1.0 en:2008

Optical fibre cables - Part 3-60: Outdoor cables - Family specification for drinking water pipe cables and subducts for installation by blowing and/or pulling/dragging/floating in drinking water pipes

$85.00 $171.00

IEC 62343-3-2 Ed. 1.0 en:2016

IEC 62343-3-2 Ed. 1.0 en:2016

Dynamic modules - Part 3-2: Performance specification templates - Optical channel monitor

$47.00 $95.00