IEEE 1267-2019

IEEE Guide for Development of Specifications for Turnkey Substation Projects

IEEE, 03/15/2019

Publisher: IEEE

File Format: PDF

$50.00$100.00


Published:15/03/2019

Pages:47

File Size:1 file , 1.8 MB

Note:This product is unavailable in Russia, Ukraine, Belarus

The scope of this guide is to provide methodology, requirements and practices for both the users and suppliers for a systematic and coordinated approach for development of specification for turnkey substation projects. This guide covers the technical requirements to develop the specifications for the engineering, procurement, construction, testing and commissioning, quality assurance/quality control and training for substations. The contractor should furnish all equipment, materials, and services as specified by the purchaser. The purchaser is responsible for the project data and information for use by the contractor in the proposal. If either party supplies technical data, that party is responsible for the data accuracy.

More IEEE standard pdf

IEEE C37.016-2018

IEEE C37.016-2018

IEEE Standard for AC High Voltage Circuit Switchers Rated 15.5 kV through 245 kV

$39.00 $79.00

IEEE C37.100.1-2018

IEEE C37.100.1-2018

IEEE Standard of Common Requirements for High Voltage Power Switchgear Rated Above 1000 V

$50.00 $100.00

IEEE C37.112-2018

IEEE C37.112-2018

IEEE Standard for Inverse-Time Characteristics Equations for Overcurrent Relays

$27.00 $55.00

IEEE 211-2018

IEEE 211-2018

IEEE Standard Definitions of Terms for Radio Wave Propagation

$39.00 $79.00