Your shopping cart is empty!
PDF Preview
American Welding Society, 02/24/2005
Publisher: AWS
File Format: PDF
$66.00$132.00
Published:24/02/2005
Pages:152
Note:This product is unavailable in Ukraine, Russia, Belarus
Presents the requirements for the design and fabrication of constructional steel weldments that are used in industrial and mill cranes, lifting devices, and other material handling equipment. Requirements are also included for modification, weld repair?
Specification for Welding of Industrial and Mill Cranes and Other Material Handling Equipment
$66.00 $132.00
Standard Welding Procedure Specification for Shielded Metal Arc Welding of Austenitic Stainless Steel, (M-8 or P-8), 10 through 18 Gauge, in the As-Welded Condition, With or Without Backing
$138.00 $277.45
Standard Welding Procedure Specification for Shielded Metal Arc Welding of Carbon Steel, (M-1, Group 1), 10 through 18 Gauge, in the As-Welded Condition, With or Without Backing
$132.00 $265.71
Standard Welding Procedure Specification for Gas Tungsten Arc Welding of Aluminum, (M-22 or P-22), 10 through 18 Gauge, in the As-Welded Condition, With or Without Backing
$120.00 $240.08
Standard Welding Procedure Specification for Shielded Metal Arc Welding of Galvanized Steel, 10 through 18 Gauge, in the As-Welded Condition, With of Without Backing
$157.00 $314.16